HYATT HOTEL AT MCLEOD – HIMACHAL PRADESH, INDIA
SLP Engineering was responsible for the design of all mechanical, electrical and plumbing services for the hotel.
The design scope supported the building’s varied facilities, including:
- Guest rooms and suites
- Banquet hall and meeting rooms
- Swimming pool
- Spa and gym
The project required careful consideration of site logistics associated with executing work in a forested mountain setting, together with the optimisation of MEP services to address local energy challenges.
- Logistics to execute the work in the forest of hotel branch
- Optimizing MEP services to meet the energy challenges in the area
Engineering a hospitality experience in a challenging mountain environment
Set within the mountainous landscape of Himachal Pradesh, Hyatt Hotel at McLeod is a hospitality development comprising 150 guest rooms and suites, alongside banquet and meeting facilities, a swimming pool, spa and gym.
Delivering a hotel of this nature in a forested mountain setting presented distinct engineering and logistical considerations. Site access and logistics were challenging, while the local environment placed particular emphasis on optimising building services to respond to energy requirements.
SLP Engineering undertook the design of all MEP services, bringing together the essential systems required to support the hotel’s accommodation, leisure and hospitality facilities.
The building in three numbers
- 150 guest rooms
Why this building matters
Hospitality developments in mountainous locations require engineering solutions that respond to both the physical realities of the site and the operational needs of the hotel. Hyatt Hotel at McLeod demonstrates SLP Engineering’s ability to deliver comprehensive MEP design in a challenging environment, with attention to site logistics and the optimisation of building services for local energy conditions.
SLP Engineering was responsible for the design of all mechanical, electrical and plumbing services for the hotel.
The design scope supported the building’s varied facilities, including:
- Guest rooms and suites
- Banquet hall and meeting rooms
- Swimming pool
- Spa and gym
The project required careful consideration of site logistics associated with executing work in a forested mountain setting, together with the optimisation of MEP services to address local energy challenges.
- Logistics to execute the work in the forest of hotel branch
- Optimizing MEP services to meet the energy challenges in the area