MARADIVA RESIDENCE – BEACH PLOT
A premium residence demands building services that are as carefully considered as its architecture. At Maradiva Residence – Beach Plot, SLP Engineering is contributing to the delivery of essential electrical infrastructure, ensuring that the systems supporting the property are installed, tested and commissioned to meet the requirements of a high-quality residential environment.
Project:Maradiva Residence – Beach Plot
Segments:Commercial, Residential Hospitality, Resorts
Location:Mauritius
Completion:Ongoing
Architect:
DH Architecture
M&E Engineer:
Sub-contractor: SLP Engineering (Pvt) Ltd
Our Scope of Work
- Supplied and installed the electrical installation.
- Undertook testing of the installed electrical systems.
- Carried out commissioning to verify system functionality and performance.
- Coordinated the electrical works within a demanding fast-track construction programme.
Challenges
- Fast-track project and 10 months completion period
Powering an exceptional residential experience through precision engineering
A premium residence demands building services that are as carefully considered as its architecture. At Maradiva Residence – Beach Plot, SLP Engineering is contributing to the delivery of essential electrical infrastructure, ensuring that the systems supporting the property are installed, tested and commissioned to meet the requirements of a high-quality residential environment.
Working alongside DH Architecture, SLP Engineering has been appointed to undertake the supply, installation, testing and commissioning of the electrical installation. Delivered within a challenging 10-month fast-track programme, the project calls for effective coordination, disciplined execution and a strong focus on workmanship.
The building in three number
- 10 months fast track programme
- 4 delivery stages – Supply, installation, testing and commissioning
- 1 core service – Complete electrical installation scope
Our Scope of Work
- Supplied and installed the electrical installation.
- Undertook testing of the installed electrical systems.
- Carried out commissioning to verify system functionality and performance.
- Coordinated the electrical works within a demanding fast-track construction programme.
Challenges
- Fast-track project and 10 months completion period